Cupro Nickel Pipe Fittings specification
Material | Sizes | Connection |
---|---|---|
Copper Nickel | Seamless : 1/2"-18" Welded : 2"-48" |
Welding |
End Type | Delivery time | Manufacturing process |
|
America : 10 - 12 days Bahrain : 1 - 3 days Canada: 6 - 12 days |
|
Schedule | Manufacturing types | Bending Radius |
Schedule 5/Schedule 10/Schedule 40/Schedule 80/Schedule 120/Schedule 160 / Schedule XXS | Welded / ERW / Seamless | 5D / 6D / 3D / 1D / 2D / 10D / 8D |
Origin | Types | Dimensions |
Japanese / Russian / USA / European / Indian / Ukraine / Korean |
|
|
Equipment | Ends | Certificates |
|
|
Raw Materials Certificate EN 10204/3.1B Third Party Inspection report |
Types of Cupro nickel pipe fittings
Copper nickel pipe fittings
Cupro nickel fittings
Copper nickel alloy pipe fittings
UNS C71500 Stub End
Cuni 1d elbow
UNS C70600 2d elbow
DIN 2.0872 3d elbow
Cuni 90/10 45 Degree elbow
Cupro nickel 10d elbow
Cupro nickel 90/10 Reducing Tee
Copper nickel 70/30 6d elbow
Copper nickel Welded fittings
Cupro nickel Long radius elbow
Cuni 90/10 8d elbow
Cupro nickel 90/10 4d elbow
Copper nickel 90/10 1.5d elbow
Copper nickel 70/30 Tee
Cupro nickel 70/30 5d elbow
Copper nickel 90/10 Short radius elbow
UNS C70600 Concentric reducer
Cuni 70/30 Equal Cross
DIN 2.0882 Eccentric reducer
DIN 2.0872 180 degree elbow
DIN 2.0882 Seamless fittings
Copper nickel Cap
Cuni 90 degree elbow
Cupro nickel 70/30 Reducer
Copper nickel fittings dimensions
NPS in Centimeter |
O.D. In MM | Buttweld Tee | Buttweld Cap | 45 Degree Elbow |
90 Degree Elbow | |
---|---|---|---|---|---|---|
C | E | B | Short Radius A |
Long Radius A |
||
5.08 | 73.025 | 3 | 1-1/2 | 1-3/4 | 2-1/2 | 3-3/4 |
2.54 | 48.26 | 2-1/4 | 1-1/2 | 1-1/8 | 1-1/2 | 2-1/4 |
2.54 | 42.164 | 1-7/8 | 1-1/2 | 1 | 1-1/4 | 1-7/8 |
1 | 33.401 | 1-1/2 | 1-1/2 | 7/8 | 1 | 1-1/2 |
7.62 | 88.9 | 3-3/8 | 2* | 2 | 3 | 4-1/2 |
5.08 | 60.325 | 2-1/2 | 1-1/2* | 1-3/8 | 2 | 3 |
1.27 | 21.336 | 1 | 1 | 5/8 | – | 1-1/2 |
10.16 | 114.3 | 4-1/8 | 2-1/2* | 2-1/2 | 4 | 6 |
7.62 | 101.6 | 3-3/4 | 2-1/2* | 2-1/4 | 3-1/2 | 5-1/4 |
1.905 | 26.67 | 1-1/8 | 1-1/4 | 7/16 | – | 1-1/8 |
30.48 | 323.85 | 10 | 6* | 7-1/2 | 12 | 18 |
12.7 | 141.3002 | 4-7/8 | 3* | 3-1/8 | 5 | 7-1/2 |
20.32 | 219.075 | 7 | 4* | 5 | 8 | 12 |
25.4 | 273.05 | 8-1/2 | 5* | 6-1/4 | 10 | 15 |
15.24 | 168.275 | 5-5/8 | 3-1/2* | 3-3/4 | 6 | 9 |
35.56 | 355.6 | 11 | 6-1/2* | 8-3/4 | 14 | 21 |
Cuni stub end chemical composition
Grade | Cu | Mn | Pb | Ni | Fe | Zn |
---|---|---|---|---|---|---|
70/30 | 65 min | 1.0 max | 0.05 max | 29-33 max | 0.4-1.0 max | 1 max |
90/10 | 88.6 min | 1.0 max | 0.05 max | 9-11 max | 1.8 max | 1 max |
cupro nickel buttweld elbow mechanical properties
Melting Point | Density | Yield Strength (0.2%Offset) | Tensile Strength | Elongation |
---|---|---|---|---|
2260 F | 0.323 lb/in3 at 68 F | 20000 psi | 50000 psi | 30 % |
Copper nickel equal tee equivalent grades
Grade | WERKSTOFF NR. | UNS |
---|---|---|
70/30 | 2.0882 | C71500 |
90/10 | 2.0872 | C70600 |